VISITOR INFO

Exhibition Info

23 - 24 SEPT 2020,
Wednesday & Thursday
(Trade Day)

25 - 26 SEPT 2020
Friday & Saturday
(Trade / Public & Student Days)

10AM - 7PM

KUALA LUMPUR CONVENTION CENTRE, MALAYSIA

Who Should Visit ENGINEER

  • Engineers from the following discipline i.e. Civil and Environmental / Mechanical
    and Manufacturing / Electrical and Electronic / Chemical and Materials and others
  • Surveyors / Contractors / Consultants
  • HVAC & R Contractors / Installers
  • Facilities and Assets Management
  • Original Equipment Manufacturers
  • Plant Owners and Operators
  • Property Development / Management
  • Project Designers / Architects
  • System Integrators
  • Traders / Distributors
  • Urban Planning Authorities / Developers
  • Utilities – Power, Water & Telecommunications
  • Education / Training Institutes / Research Institutions
  • Government & Regulatory Administrators

Exhibitor Profile

  • Air Flow, Air Quality Systems and Applications
  • Automation Technology, Controls and Application
  • Chemical Application, Equipment and Technologies
  • Chemical Processing, Packaging, Storage and Transportation
  • Computer Software Technologies, Development, Consultancy and Services
  • Elevators, Escalators Solutions, Systems and Technology
  • Energy Efficiency and Big Data Analytics Technology
  • Filtration, Water Treatment, Systems and Technology
  • Heating, Cooling Systems and Insulation Technology
  • Mounting Systems, Components and Materials
  • Power and Surge Protection Technology, Devices and Systems
  • Power Tools, Machinery, Materials and Parts
  • Renewable Energy, Thermal and Solar Technology
  • Wires, Cable, Cabling, Electrical Supplies and Systems

Getting There

The Kuala Lumpur Convention Centre is located near the city’s iconic Petronas Twin Towers, connected by rail or road. You can opt to take the Light Rail Transport (LRT) Kelana Jaya line and disembark at KLCC Station where the Convention Centre is a 10 minute walk away.

Following the opening of the Mass Rapid Transit (MRT), you may now opt for this alternative way to reach the destination. Keep an eye on the updates of the opening of station Muzium Negara – Kajang Line (Phase B) scheduled to be in operation by July 2017. Otherwise, you may also choose to park at the surrounding buildings or shopping malls and use the air conditioned Bukit Bintang-KLCC Covered Pedestrian Walkway that takes approximately 10-15 minutes to walk to the Convention Centre.

LRT to KLCC (ENGINEER)

Maps

Hall Layout

ENGINEER 2020 Hall Layout